PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing metal decking at Steel arch Facing East (800x600).jpg Started installing the temporary stair Facing South (800x600).jpg Underground storm piping between column lines G-G.1 Facing North (800x600).jpg Gravel for Stair -5 pit Facing North (800x600).jpg Installed metal decking at Steel arch Facing East (800x600).jpg Placing 3-4 gravel insde Stair -5 pit Facing West (800x600).jpg Started installing rebar mats at Elev. 1,2,3 (3rd Floor) Facing South-West (800x600).jpg Started installing the shear wall panels at Elev. 5,6 (3rd Floor) Facing East (800x600).jpg Underground roughing for sanitary sewer by Elev. 1,2,3 Facing South (800x600).jpg
Previous pageNext page Installed metal decking at Steel arch Facing East (800x600)
Installed metal decking at Steel arch Facing East (800x600)